Wellesley college notable alumni12/31/2023 ![]() For next year School Council has been changed to have eleven members: two teachers, four students, and three parents, a community member, and the Principal.Co-Moderator (Principal), Co-Moderator (Student).However, the final project came in under budget at $90 million and opened 18 months ahead of schedule. The total cost was estimated to be $130 million with $85 million of that total to be raised from State and Federal matching funds. The new structure, which opened to students in February 2012, incorporates some of the design features of the prior building and is limited in its visual impact to blend with the surrounding residential neighborhood. review opened the door for the eventual knock-down and the final site plotting. The state authorities held the final say in this ruling, but the A.I.A. Īfter much analysis, the existing structure was declared to be a good example of the Art Deco style of architecture however, it was found by the American Institute of Architects (A.I.A.) not to be a historically significant example and was demolished in 20. The new facility opened in February 2012, and the school held a gala to say goodbye to the old building, and alumni such as Billy Squier, Jane Curtin, and Biz Stone gave last rites in the school auditorium over a series of weekend concerts and get-together events in 2011. ![]() Construction began March 2010 with an estimated completion date of September 2013. Site clearance started in August 2009 with the relocation of one house to a nearby site. On December 10, 2008, town voters approved the project by a nearly 2 to 1 ratio (5,026 YES to 2,869 NO), to build a new, state-of-the art high school on the parking lot next to the existing buildings. The site was expanded by purchase of three adjacent properties in Seaver Street and transfer of publicly owned land. In October 2007, a public meeting was held to introduce several options for the expansion of the school, including renovation and extension of the existing building and its demolition and replacement by a completely new structure. In September 2005, the exploration of options for a new building or refurbishment was commenced by the town. The increasing size of the student body as well as the evolving nature of education challenged the capability of the 1938 building to meet the needs of the school community effectively and safely. Renewal and expansion Wellesley High School in 2009 before demolition The 1938 building was replaced in 2012 with a new building constructed in the former parking lot. The building has been modified with several additions throughout its existence, most recently with a new fitness center. The old school building of what was then named Gamaliel Bradford High School was originally built as a public works project in 1938 during the Great Depression, designed by Perry Shaw and Hepburn and built by M. In 2022 it was ranked the 32nd best high school in Massachusetts and the 785th best public high school in the nation by U.S. As of 2023, the school serves 1420 students. The principal is Jamie Chisum, who took the position in 2014 after the departure of Andrew Keough. Wellesley High School is a public high school in Wellesley, Massachusetts, United States, educating students on grades 9 through 12.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |